Home
Financing & Rebates
Q&A
Careers
Schedule Appointment
Home
Financing & Rebates
Q&A
Careers
Schedule Appointment
Project Manager Client Check List
Client Name
First Name
Last Name
Property Address
Address 1
Address 2
City
State/Province
Zip/Postal Code
Country
Pre-measure requirements
Confirm municipality and permitting requirements.
Confirm structural work; this should be listed clearly below to facilitate permitting
*
Arrival at measure
Ask customer if we have installed phases in their home in the past. If so, view install to confirm method.
Confirm contract with customer to include window/door style, color, operation, screening and glass.
*
Interior Inspection
Assess every opening; never assume windows share dimensions. Check existing opening for level, plumb and square.
Measure width in three points; measure height in three points; cross tape opening.
*
Assess potential issues with interior blinds, plantation shutters, alarms or other potential obstacles.
*
Identify each window by number so crews are aware of location and work to be done.
*
Take pictures of any pre-existing damage, unusual staging requirements or obstacles.
*
Take note of any accessibility issues (e.g. glass china cabinets, entertainment centers, pianos)
*
Take note of interior trim style; ask for samples of non-standard trim or use trim comb to profile.
*
Take appropriate notes for any required structural/opening modification (cut down for egress, header, etc.)
*
Take note of elevation and glass requirements
*
Confirm grille type and pattern as required. Take note of adjacent windows that may require NSPR for alignment.
*
Exterior Inspection
Assess every opening. Check exterior openings for level, plumb,square.
*
Measure width in three points; measure height in three points; cross tape opening.
*
Determine if exterior brick, stucco or trim will impact the installation.
*
Confirm exterior trim style.
*
Confirm jamb depth for extension jambs
*
Photo documentation of any staging or exterior obstacles.
*
Close out with Customer
Discuss any potential issues with install and how these will be addressed
*
Give customer open-ended time frame for installation; never specify dates
*
Thank customer for their time and let them know we look forward to working with them.
*
Completion of Measure
CONFIRM CORRECT WINDOW STYLE, COLOR, ORDER SIZE, OPERATION, etc. BEFORE SUBMITTAL
DOUBLE, TRIPLE CHECK ALL WORK FOR ERRORS BEFORE SUBMITTAL
Maintain symmetry with adjacent windows; size the same and instruct for cut backs as needed
Determine materials required for one time completion of job. This should include:
Check all that apply
Padding materials as needed
Opening prep materials (coil for flashing, insulation)
Interior and exterior trim
Extension jamb materials.
Finishing materials (coil, sealant, glue)
Any specialty trim required. This should be listed in notes below
Trim Notes
Clear job details. Take note of specific window issues, egress requirements, etc. No abbreviations.
NSPR generation for grille alignment, pattern, odd size or shaped windows.
Project Summary and additional notes
Thank you!